Place: Turin
Client: S.C.R. Piedmont
Duration: 2016 – underway
The intervention incudes the construction of special electrical systems and mechanical fire prevention systems to protect the museum’s valuable property.
The works include the execution of control systems (smoke detectors – CCTV – evacuation drills) and fire sprinkler systems through the construction of an accumulation basin and a state of the art water-mist system that uses a very fine mist of micro-drops of water to control, suppress and extinguish a wide range of fires reducing water damage and eliminating the danger of toxic fumes for people.
Surface area 3,200 m2