Location: Turin
Operator: Committee of the solemn Shroud exhibition 2010
Year: 2010
The intervention involved the development of the surrounding spaces of the Cathedral for the public and particularly the prefecture: the exit path of the Cathedral, the raised cemetery and the Cathedral downhill path. The provision was supplemented through electrical devices in place.